
Oracle Primavera
Enterprise Project PortfolioManagement
Oracle’s Primavera is the leading global provider of cloud and on-premise Enterprise Project Portfolio Management (EPPM) solutions.
$2.00/ month
Oracle Primavera
EPPM leaders and executive stakeholders across all industries rely on Oracle’s Primavera solutions to improve strategy execution, operations and financial performance.
Powerful Tools for Global Project Planning
Primavera P6 Enterprise Project Portfolio Management is the most powerful, robust and easy-to-use solution for globally prioritising, planning, managing and executing projects, programs and portfolios in asset-intensive industries.
Learn More about Powerful Tools for Global Project Planning
Success Stories
Keeping up with constant modifications with BIM
REDWOOD INTERIOR PTE LTD, specialized in providing high quality interior and façade solutions to the world's leading luxury retailers. Having to work for various different projects in silos, they were facing challenges to collaborate efficiently with the large BIM files sizes received when working with the different vendors and the need to run simulations with analysis to identify design problems before construction.
Moving from Local host to Cloud Implementation.
CHANG HUA CONSTRUCTION PTE LTD specialized in procuring, importing and installing a special material that meets unique building construction requirement for designed projects. They are also well known in supplying superior labour force in project bidding. They faced the challenge of getting their various stakeholders regionally to seamlessly collaborate with the need to reduce the number of RFIs and variation orders during the construction phase.
Easy and Centralized Collaboration with Subcontractors
TEAMBUILD ENGINEERING & CONSTRUCTION PTE. LTD. was facing challenges when working with subcontractors. They needed to find a solution to work simultaneously on one single file on cloud and overcome problems with objects being removed accidentally by other sub cons. It was crucial to have an option to prevent users from one discipline to erase objects in other work sets and also improve on a centralized file exchange method.
Compelling Product Configuration Drives Efficiency and Leads
The Promor Pte Ltd uses Autodesk® PDMC® to design and manufacture products, using the software’s rules-based engineering capabilities to capture and reuse existing range hood features instead of designing every custom product from scratch. To manage engineering and CAD data, Promor Singapore uses Autodesk® Vault. The software helps the company’s engineers organize design data, manage documentation, and track revisions for both standard and custom range spare and wear parts.
Fast tracking issues with Autodesk Cloud Construction
DEEN specialized in delivering project excellence and sustainable construction practices. They faced the challenge of having a tedious and lengthy process in paperwork involved in quality and safety inspections. They noticed information slipped between the cracks with their existing (non-Autodesk) Cloud Service Platform that needs to be addressed along with several areas of the work processes.
Moving from CAD to BIM for Main Con Submission
S.H. STAINLESS STEEL CONTRACTOR PTE LTD is specialized in the assembly and fabrication of industrial equipment, steel metal and structural works. They faced the challenge of having a tedious process for preparing CAD drawings for approval workflow. They spent lots of time reproducing the same drawings from design to construction phase without visualization and submitting them to the Main Con (MC). This caused multiple errors and decreased their productivity significantly.
Improved Efficiency with BIM for BCA & URA Authority Submission
TCP Consultants Pte Ltd is offering professional and expert services in Civil and Structural Engineering consultancy and project management works. They spent a significant amount of time on producing drawings from design to the submission phase by using their CAD workflow. This was a tedious process due to the lack of file exchange method. TCP Consultants Pte Ltd wanted to use BIM-based processes instead to improve their efficiency in preparing BCA & URA authority submissions.
Scaling Pipeline Performance with Autodesk ShotGrid
OMENS STUDIOS is an award-winning animation studio built for the digital age and specialized in Animated Series, Short films, Visual Special Effects, and commercial work for clients across all industries internationally. With a diversely large number of employees to handle, they had to keep track of daily and weekly updates on a task-by-task basis. They were facing a tricky challenge on tracing “Retakes” or “Kickback” when a completed Task from Shot reviews needs to be revised due to a request further down the pipeline.
Why Choose Us
Innobim combines technology, expertise and support to help you get more from every solution.
Industry Expertise
Decades of experience across technology, AEC and digital construction.
Certified Specialists
Work with trained professionals and authorized technology partners.
End-to-End Support
From consultation and implementation to training and technical support.
Leading Technology
Access solutions from some of the world's leading technology brands.
